Gary D. Crocker |
|
Employment History |
4/1/06 to Present |
9/19/2003 to 3/31/2006 |
6/20/2003 to 9/18/2003 |
2/21/2002 to 6/19/2003 Multimedia Developer - Crocker Media Expressions
|
8/21/2001 to 2/21/2002 Mechanical/Structural Planner - The Boeing Company
|
7/2/2001 to 8/20/2001 Quality Specialist 2 - IT Services, Inc. (Client: The Boeing Company)
|
8/23/2000 to 3/30/2001 Quality Specialist 2 - Chipton Ross, Inc. (Client: The Boeing Company)
|
1/12/1987 to 1/4/2000 Mechanical/Structural Planner Sr. - The Boeing Company Composites/Non-Metallics Planning Analyzed complex blueprints and specifications for a variety of non-metallic details and assemblies and created fabrication plans based on this analysis. Examples. Created flow charts of proposed sequencing for some of the more complex assemblies and coordinated these flows with Design Engineering, Materials and Process Engineering, Manufacturing Engineering, Quality Engineering and shop management. Prepared extensive Excel workbooks for tracking out-time of perishable materials.
|
7/1985 to 1/1987 Manufacturing Planner - Hitco Composites Planning Responsible for the maintenance of planning for fabrication of the Flap Track Fairings for the Boeing 767. This involved approximately 150 plans covering prepreg layup of hybrid assemblies, bulkhead assemblies and final assembly and painting of the finished fairing. |
9/1979 - 7/1985 Teacher - Westminster Christian Schools Science Teacher - Junior High Taught Science, Study Skills (grades 6 thru 8), and Bible (home room - grade 8). Yearbook Editor - including photography and darkroom work. |
11/1978 - 9/1979 Maintenance Man - Westminster Christian Schools General maintenance, remodeling and janitorial duties. |
9/1976 - 1/1978 Minister of Outreach - Bethany Bible Fellowship Led visitation program. Wrote public relations articles. |
1/1971 - 8/1976 Distribution Clerk - US Postal Service Sorted mail. |
1/1966 - 10/1969 Communications Operations Specialist - USAF Held Security Clearance. Honorably discharged. |